Call Us At The Start Of Design
![](https://ckbuilders.net/wp-content/uploads/2016/09/Wolf-Bath1-3.png)
- Design-build process incorporates cost trade-off analysis into the design process so both budget and efficiency targets are met.
- Avoid the scenario wherein the permit set is sent out to bid and all of the bids are over your budget.
- To get the most efficiency for project budget, it is best to incorporate passive solar features which must be integrated at the outset of design.
- It is best to include us in the design discussion from the outset of the project so we can advise your design team on how to best achieve your efficiency goals.
![](https://ckbuilders.net/wp-content/uploads/2016/08/Wolf-Kitch1.jpg)
Call Us Today For A Free In-Home Consultation : (805)438-3087
Copyright © CK Builders 2020
LIC # 786754